CIP CIRCUIT AND ACCEPTANCE RECORD — BLANK TEMPLATE This is a blank planning/record form, not a completed or validated cleaning cycle. Project / record ID: Date / operator / reviewer: Cleaning object and circuit ID: Drawing / recipe / software revisions: Connected duties / simultaneous duties: Products / soil / time before cleaning: Supply path / return path / production isolation: Tank assignments / recovery policy / rejected-return destination: Actual internal bore / length / equipment hold-up: Pump duty / heating duty / utility conditions and units: Instrument tags / locations / verification references: PHASE RECORD (repeat for each agreed phase) Phase / source / destination: Start / end / actual contact interval: Supply and return flow / temperature / units / record references: Chemistry measurement / method / result / units: Valve permissions / return diversion / observations: Alarm / interruption / corrective action / restart approval: ACCEPTANCE AND HANDOVER Agreed operating criteria and document revision: Actual results and raw record references: Surface inspection / residue / hygiene method and sampling locations: Result / deviation / disposition / responsible approver: Skid supply / site piping / utilities / controls / validation responsibilities: Outstanding items / owner / due date: