Storage and circulation
Tank allocation, working inventory, pump operating points and return collection affect the mechanical arrangement. Compare duties rather than a nominal tank count.
Heating and measurement
The utility arrangement and required instrument points change both the equipment and installation scope. Identify flow, temperature and return assessment responsibilities.
Valves and controls
Circuit selection, actuation, feedback, recipe handling and plant integration add different levels of scope. Name the functions included in each offer.
Installation boundary
Specify what belongs to the skid and what belongs to site piping, wiring, utilities, drainage and access. A compact package does not remove site work.
Acceptance and documentation
Agree drawings, interface information, commissioning checks and cleaning acceptance responsibilities. Compare exclusions as carefully as included components.


